DMP Changes to AER Guidelines and Mine Activity Types

posted in: News | 0

DMP have drafted revised guidelines for the preparation of Annual Environmental Reports (AERs) and are inviting stakeholder feedback on the draft. The AER Mine Activity Types available on EARS2 have also been changed to match the MRF Types.

MBS 2014 Calendar

posted in: News | 0

The MBS wall calendar for 2014 has been printed and posted out. We have a limited supply of surplus calendars, so if you missed out or would like extras, please get in touch.

Environmental Regulation Changes for Resource Projects in WA

posted in: Briefing Notes, News | 0

A number of changes to the regulation of resource projects in Western Australia are being implemented by DMP in 2013 to 2014. The main changes are: The Reforming Environmental Regulation Program, restructuring of environment Functions within DMP, online submission of Annual Environmental Reports and the introduction of the Mining Rehabilitation Fund to replace the current environmental bond system.

Upload

posted in: Downloads | 0

Client File Upload Page Upload Files Below (maximum size ~30MB) Files will only be accessible to you and MBS staff. [nm-wp-file-uploader]